Project Timeline

17+ Restoration Jobs Completed

Every emergency restoration job follows a structured response process: arrival, inspection, protection, removal, drying, cleaning, and documentation.

17

Professional Attic Mold Remediation Services

  1. Final walkthrough completed and project closed

    Completed in 6 days
  2. Reconstruction of affected attic areas completed

  3. Attic ventilation corrections performed to restore proper airflow

  4. Antimicrobial treatment and structural encapsulation completed

  5. Removal of affected insulation and drywall began

  6. Containment barriers installed and HEPA air filtration equipment placed

  7. Work authorization signed and remediation plan approved

  8. Mold inspection performed and ventilation deficiencies identified

  9. Homeowner contacted Masterpros regarding suspected attic mold growth

16

Mold Prevention & Odor Control Treatment

  1. Project completed and post-treatment recommendations provided

    Completed 5 days ago
  2. Hydroxyl treatment completed to assist with odor reduction and environmental treatment

  3. Cold fogging performed using antimicrobial disinfectant throughout affected areas

  4. Property prepared and antimicrobial treatment protocol initiated

15

Emergency Dry-Out Service After Water Leak From Unit Above

  1. Drying goals achieved and equipment removed from property

    Completed 7 days ago
  2. Structural drying equipment and dehumidification systems installed

  3. Initial inspection performed and water damage from unit above documented

14

Water Extraction & Mold Removal Services

  1. Water damage restoration and mold remediation project completed

    Completed 2 weeks ago
  2. Demolition of affected materials performed and antimicrobial treatment initiated

  3. Initial inspection performed and emergency water extraction completed in affected areas

13

Mold Remediation Following Hidden Leak Discovery

  1. Mold remediation completed and final project walkthrough performed

    Completed 2 weeks ago
  2. Mold remediation work began, including removal of damaged hardwood flooring and treatment of affected areas

  3. Leak detection services completed and structural cracks identified as contributing factors

  4. Inspection performed and hidden moisture source investigation initiated

12

Attic Mold Remediation From Poor Duct Installation

  1. Mold remediation, ductwork replacement, affected material removal, mold treatment, and reconstruction service completed

    Completed 3 weeks ago
  2. Attic mold remediation work began

  3. Work authorization signed

  4. Inspection performed at property on Paloma Dr

11

Free Mold Inspection - Rio Vista Residence

  1. Inspection completed and findings reviewed with homeowner

    Completed 3 weeks ago
  2. Microbial growth identified on contents and surfaces; dirty AC coils, high humidity, and attic insulation deficiencies documented

  3. Free mold inspection performed at Rio Vista residence

10

Flood Recovery From AC Drain Leak

  1. Drying process completed and flood recovery project finalized

    Completed last month
  2. Drying equipment placed and structural drying process initiated

  3. Initial inspection performed after flooding caused by a clogged AC drain line

09

Emergency Water Extraction & Dry-Out After Dishwasher Leak

  1. Drying goals achieved, equipment removed, and project completed

    Completed last month
  2. Water extraction completed and structural drying equipment installed

  3. Emergency water damage restoration project initiated following dishwasher leak affecting walls and flooring

08

Professional Mold Remediation Services

  1. Mold remediation completed and final project walkthrough performed

    Completed last month
  2. Containment established and mold remediation work began

  3. Work authorization signed and remediation schedule approved

  4. Initial mold inspection performed and affected areas documented

07

Mold Removal Following Hidden Bathroom Leak

  1. Mold removal completed and final walkthrough performed

    Completed 2 months ago
  2. Containment established and mold remediation work initiated

  3. Moisture damage and microbial growth documented in affected building materials

  4. Inspection performed and hidden leak behind bathroom vanity identified

06

Water Damage Restoration From Leaking Water Supply Line

  1. Dry-out process completed, affected structure treated, and project finalized

    Completed 2 months ago
  2. Water extraction, demolition of affected materials, structural drying, and treatment work began

  3. Initial inspection performed and moisture intrusion documented in walls and flooring

  4. Emergency call received regarding water damage from leaking refrigerator water supply line

05

Condo Mold Remediation Due to HVAC Humidity Issues

  1. Mold remediation completed and final walkthrough performed with property owner

    Completed 3 months ago
  2. Containment established and mold remediation work initiated after identifying defective AC handler and thermostat as the source of elevated humidity

  3. Mold inspection performed and humidity-related microbial growth documented throughout the condominium

04

Free Mold Inspection

  1. Inspection completed and findings reviewed with homeowner

    Completed 3 months ago
  2. Initial mold inspection performed including visual assessment, thermal imaging, and moisture mapping

  3. Homeowner contacted Masterpros regarding suspected mold growth

03

Cigarette Smoke Odor Removal Service

  1. Odor removal services completed and final air quality evaluation performed

    Completed 5 months ago
  2. Odor removal process initiated including cleaning, air filtration, and deodorization treatments

  3. Inspection performed and cigarette smoke odor sources documented throughout the vacation rental

02

Water Damage Restoration From Burst Copper Pipe

  1. Drying process completed and project finalized

    Completed 5 months ago
  2. Drying equipment installed and structural drying process initiated

  3. Initial inspection performed and affected areas documented

  4. Emergency call received regarding water damage caused by a burst copper pipe

01

Water Damage Restoration After Heavy Rain

  1. Drying completed and project finalized

    Completed 8 months ago
  2. Drying equipment placed and structural drying process initiated

  3. Initial inspection performed and affected areas documented

  4. Emergency call received regarding water intrusion caused by heavy rain

Need Immediate Help?

(305) 791-9248