Case Study
Project Summary
Responded to an active water damage incident in a multi-family building corridor. Located an internal PVC pipe leak within the drywall cavity, performed controlled demolition to expose damaged wall studs and insulation, set up plastic containment barriers along the hallway, and monitored structural moisture using FLIR thermal imaging.
Area
Miami
Completed
Aug 19, 2026, 11:05 AM
Response
Documented Workflow
Project Timeline
On-Site Mitigation
Emergency Call
Project Media
Project Media
Photos documented from this restoration case.