Case Study
Project Summary
Conducted a thorough mold inspection in Miami. Identified heavy microbial buildup surrounding an AC ceiling supply register, recorded elevated relative humidity levels (61.8%), and detected high moisture levels behind built-in closet shelving using a Protimeter MMS3.
Area
Miami
Completed
Jul 26, 2026, 2:00 PM
Response
Documented Workflow
Project Timeline
On-Site Assessment
Inspection Request
Project Media
Project Media
Photos documented from this restoration case.